HomeInnovationHow an overlooked geothermal plant got a second chance

How an overlooked geothermal plant got a second chance

image

In June 2024, a small company called Zanskar purchased a geothermal power plant in New Mexico that was failing fast. The water coming from the underground reservoir was getting colder by the day, making the plant uneconomical to run.

Now, two years later, that plant is running at full capacity again, thanks to a new well. With the help of advanced modeling and modern drilling technology, the company was able to identify a better potential well site, drill down thousands of feet, and revive the entire operation.

As the world looks for more sources of emissions-free electricity that are available 24-7, Lightning Dock shows there’s still hidden potential deep beneath our feet. 

Conventional geothermal power plants rely on having the right underground conditions. Water flows through fractured hot rocks to harvest heat and then through a power plant to generate electricity. If the water isn’t hot enough or not

...

This post was originally published on this site.

RELATED ARTICLES
- Advertisment -spot_imgspot_img

Most Popular

- Advertisment -spot_imgspot_img
- Advertisment -spot_imgspot_img